Pavilions Shopping Centre

Pavilions Swords Phase 2 Extension

We were appointed as a nominated package sub-contractor to complete the plasterboard elements on Pavilions Swords Phase 2 extension. Our package works included forming metal stud frameworks finished with plasterboard to form curved external wall linings, false beam casing to high level trusses to the glazed roof and feature ceilings in the public mall areas of the shopping centre. The project was completed in September 2006 in conjunction with the main contractors McLaughlin & Harvey (approx value €450,000).

Unit 39 Pavilions Shopping Centre, Swords

Our works on this project involved the division of an existing shop unit to provide public toilets and a smaller retail unit. New works included the construction of metal stud partitions, shaftwall partitions to service risers and MF plasterboard ceilings. The project was completed in August 2008 for Ardmac (approx value €40,000).

Unit 5-7 Pavilions Shopping Centre, Swords

New works included the construction of metal stud partitions to form a staircase enclosure soffit and beams forming a new mezzanine floor. The project was completed in August 2008 for Ardmac (approx value €55,000).