Hotel

As part of a mixed development scheme at Arena Tallaght in Dublin we were involved in a new 120 bedroom hotel fitout for the Tower Hotel. The hotel included a large reception hall, bar, restaurant, gym and spa facilities, function suite, conference rooms, circulation and atrium areas (Total area including bedrooms 11,000m2).
Our works included metal stud internal partitions and wall linings, plastering, MF ceilings and feature bulkheads throughout the Hotel.